| News

Underground Cabling Work by Hydro-Québec

The City of Pointe-Claire would like to inform you that Hydro-Québec will be carrying out underground cabling work on Saint-Jean Boulevard, from July 2 to 4, from 8 a.m. to 5 p.m. This work will result in a lane closure on the right-hand side of Saint-Jean Boulevard heading south, between Brunswick Boulevard and the entrance ramp to the service road of Highway 40 heading west.

We invite drivers to remain vigilant and slow down for the safety of workers.

Thank you for your understanding.

Engineering Department
514-630-1208, ingenierie@pointe-claire.ca